he maintenance work at the Indezi River Bridge, located at N3-4 km 30.2 in the vicinity of the Balgowan/Curry’s Post Interchange (I/C 125) had to be postponed to Thursday, 18 July 2024.
The works will now require the temporary closure of the NORTHBOUND carriageway of the N3 Toll Route TOMORROW between 10H00 and 12H00.
Obtain real-time, verified traffic information and emergency assistance from the 24-hour N3 Helpline on 0800 63 43 57 or by following @N3Route on X.